1、

Study on the calculation method for the work's total float time

工作总时差计算方法的探讨

互联网摘选

2、

The basic parameters of an event are total float time, free float time, and initial time and ending time.

工作的总时差、自由时差和工作的开始与完成时间是工作的主要时间参数。

互联网摘选

3、

The total float time is one of the important time parameters of the work, and its value is the basis to determine the critical works and pathes.

工作总时差是工作最主要的基本时间参数之一,其大小是网络图中关键工作和关键线路的判别依据。

互联网摘选

4、

In the practical engineering processes, the amount of resources is strictly limited, so in the actual engineering, the traditional CPM can not give the correct total float and critical path.

在实际工程中工序的资源量是受到严格限制的,传统的CPM法不能给出正确的工序总时差和关键路线。

互联网摘选

5、

This paper shows the incompatability of system structure of the model of the network diagram, thus realizes the demonstration that algorithm for the total float of A on N and A on A is mistaken.

本文揭示了传统网络构图模型系统结构的不相容性,从而实现了传统网络总时差的计算是错误的论证。

互联网摘选

  • 今日热词
  • 热门搜索

纳米英语英语词典(dict.nm3.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈